Skip to content

How can I edit event info? In which status?

Online version: https://help.allmaz.az/guides/sourcing/edit-event-info/

Event info (name, method, dates, category) is edited in the Event constructor while the event is still a Draft: Main info → FILL / EDIT → SAVE.

  1. Open the draft event

    On the Sourcing dashboard, click the draft event’s row (here “ID-78808 - My New Tender (78808)”) to open it in the Event constructor. Check the status badge in the header says Draft.

    Step 1: Open the draft event — click “ID-78808 - My New Tender (78808)”.
    Step 1: Open the draft event — click “ID-78808 - My New Tender (78808)”.
  2. Open Main info

    In the Main info block, click FILL (EDIT once Main info has been saved). The “Configure your event” panel opens.

    Step 2: Open Main info — click “FILL”.
    Step 2: Open Main info — click “FILL”.
  3. Change the name and document number

    Type the event name in Event name* and, if you use one, your Internal document number.

    Step 3: Change the name and document number.
    Step 3: Change the name and document number.
  4. Set the timeline

    Type the Event start date, Q&A session end date and Offer submission end date (DD/MM/YYYY), each with its Time (HH:MM). Typing is quicker than the calendar and clock pickers.

    Step 4: Set the timeline — click “Event start date”.
    Step 4: Set the timeline — click “Event start date”.
  5. Open Purchasing category

    Under Purchasing category, click SELECT. The panel can’t be saved without a category.

    Step 5: Open Purchasing category — click “SELECT”.
    Step 5: Open Purchasing category — click “SELECT”.
  6. Choose a CPV category

    Select the CPV code that fits the purchase (here “00000000-1 - General”).

    Step 6: Choose a CPV category — click “00000000-1 - General”.
    Step 6: Choose a CPV category — click “00000000-1 - General”.
  7. Confirm the category

    Click SAVE in the “Select CPV code for event” dialog. The block now shows “1 category selected”.

    Step 7: Confirm the category — click “SAVE”.
    Step 7: Confirm the category — click “SAVE”.
  8. Choose the method

    Open the Method* list and pick the procurement method, e.g. Request for Quotation (RFQ). The default “RFX” is not accepted on save.

    Step 8: Choose the method — click “Method*”.
    Step 8: Choose the method — click “Method*”.
  9. Save

    Click SAVE at the top right of the panel. A “Saved” message appears and Main info shows “Filled” with your new details.

    Step 9: Save — click “SAVE”.
    Step 9: Save — click “SAVE”.
  • Event info can only be edited while the event is a Draft. Once it is published, the General info tab is read only (no FILL or EDIT).
  • SAVE checks the panel: without a Purchasing category it shows “Category is mandatory.”, and with Method left at “RFX” it shows “Please update the Method field selection.”
  • After the first save the Main info button changes from FILL to EDIT. Use EDIT to change the event info again later.
  • Payment details and Watchlist in the same panel are optional.

Watch it in the training video

Event constructor: watch list and saving basic information

Start the evaluation (open the envelopes)

Ask about procure.az

Ask in English, Russian or Azerbaijani. Answers come from these guides and the procure.az training videos.

AI-generated answer: check important steps in the linked guide. Don't include personal data.